Incoterms and Delivery Terms

What is CIF? Transfer of risk, insurance and the difference from CFR

Short answer

CIF is an Incoterms 2020 rule under which the seller pays freight to the port of destination and takes out cargo insurance. It applies only to sea and inland waterway transport. The critical distinction is this: cost is carried by the seller up to the port of destination, but risk passes to the buyer as soon as the goods are loaded on board the vessel at the port of loading. The minimum insurance cover required is ICC (C).

Updated: August 24, 20269 min read

CIF (Cost, Insurance and Freight) is one of the Incoterms 2020 rules published by the International Chamber of Commerce. The rule places three obligations on the seller together: loading the goods on board the vessel at the port of loading, paying freight to the port of destination, and taking out insurance on the cargo.

CIF is used only for sea and inland waterway transport. In Incoterms 2020 the four rules in this group are FAS, FOB, CFR and CIF. CIF is not used for air, road, rail or multimodal transport; its functional counterpart in those modes is CIP.

When writing the rule, the port of destination is specified: for example, “CIF Mersin, Incoterms 2020”. The port named here is not where risk transfers — it is where the seller’s obligation to pay for carriage ends.

One point needs to be separated from the outset: Incoterms rules do not govern when ownership of the goods passes, how payment is to be made, which law applies to the contract, or where a dispute is to be resolved. These are separate clauses of the sales contract.

Where cost and risk transfer

This is CIF’s most critical feature, and the source of the most common misreading: cost and risk do not transfer at the same point.

Transfer of risk: the goods pass to the buyer the moment they are loaded on board the vessel at the port of loading. The test is the goods’ actual loading on board; the “passing the ship’s rail” language used before Incoterms 2010 has been abandoned.

Transfer of cost: the seller pays the freight and insurance premium to the port of destination. In other words, the seller bears the cost of a carriage that is no longer at its own risk.

The practical result is this: if the cargo is damaged after the vessel has sailed, the buyer bears the loss even though the seller paid the freight. The buyer cannot tell the seller “you arranged the carriage, so you cover the damage.” The buyer must pursue the insurer, or the carrier if there was fault. The seller’s obligation is complete once the goods are loaded on board in conformity with the contract and the documents are handed to the buyer.

This structure also explains why insurance is made compulsory: the party bearing the risk and the party taking out the policy are different. That is why the seller must arrange a policy or insurance certificate that the buyer can claim on directly, and must deliver it to the buyer.

Allocation of responsibility

Item Seller Buyer
Export customs formalities and costs Yes —
Loading on board at the port of loading Yes —
Main carriage (freight) Yes —
Cargo insurance (minimum ICC C) Yes —
Risk of damage/loss during carriage Until loaded on board After loaded on board
Discharge at the port of destination If included in the carriage contract taken out by the seller Otherwise the buyer’s
Import customs formalities and duties — Yes
Carriage from the port of destination to the final address — Yes

Seller’s obligations

  • Provide the goods, the invoice and the required documents in conformity with the contract.
  • Carry out export customs formalities, obtain the necessary permits and licences, and bear their cost.
  • Load the goods on board the vessel at the port of loading.
  • Contract for sea carriage to the port of destination in its own name and pay the freight.
  • Take out cargo insurance and pay the premium; transfer the policy or certificate so the buyer can claim on it directly.
  • Provide the buyer with the transport document evidencing that the goods have been loaded on board (usually a bill of lading).
  • Bear the cost of the checking operations necessary for delivery (measuring, weighing, counting, quality control), packaging and marking, and of any pre-shipment inspection mandated by the authorities of the export country.
  • Notify the buyer in good time that the goods have been delivered (loaded on board) and give the buyer the information needed to take delivery at destination.

Buyer’s obligations

  • Pay the contract price.
  • Bear the risk of damage and loss from the moment the goods are loaded on board.
  • Pay any additional costs arising during carriage that are not included in the freight.
  • Cover discharge costs at the port of destination unless these are the seller’s under the carriage contract.
  • Carry out import customs formalities; pay customs duty, VAT and other import charges.
  • Arrange and pay for carriage from the port of destination to the final address.
  • Bear demurrage, storage and terminal costs arising from exceeding free time, to the extent they are not for the seller’s account under the contract of carriage (freight/charter). (“Demurrage” means the carrier’s charge for exceeding terminal free time in container trades, and compensation paid to the shipowner for exceeding laytime in charter trades.)
  • Take out additional insurance if it considers the minimum cover insufficient.
  • Pay the cost of pre-shipment inspection (PSI) where required by the import country’s regulations.
  • Where the buyer has the right to determine the time for loading and/or the point of receipt at the destination port, give the seller sufficient notice.

Insurance cover and the difference from CFR

Under Incoterms 2020 the minimum cover for CIF is Institute Cargo Clauses (C). ICC (C) is a narrow cover and includes only a limited list of risks: fire and explosion, the vessel being stranded, grounded or capsized, collision or contact of the vessel, craft or conveyance with any external object other than water, overturning or derailment of a land conveyance, discharge at a port of refuge, general average sacrifice, jettison and the like. Common types of damage such as theft, non-delivery, wetting and breakage are not covered under ICC (C).

The sum insured must be at least 110% of the contract price and in the contract currency. Cover runs from the point of delivery of the goods to at least the named port of destination.

The distinction introduced by Incoterms 2020 matters here: under CIP the minimum cover is ICC (A), i.e. broad cover, while under CIF it has been left at ICC (C). The parties are not bound by this default; broader cover (ICC A or B, war and strikes clauses) can be agreed by contract. This needs to be written explicitly into the sales contract, otherwise the minimum level applies.

The difference from CFR is a single item: under CFR (Cost and Freight) the seller has no obligation to take out insurance. The point of transfer of risk, the allocation of costs and the field of use are the same as under CIF. In short, CIF = CFR + insurance.

When it is the right choice

  • For bulk cargo, bagged cargo and break-bulk cargo, in jobs where the goods are loaded directly into the ship’s hold.
  • When the buyer does not have the network or volume to negotiate freight in the loading country.
  • For letter-of-credit transactions, where the seller produces the bill of lading and the insurance policy from a single source, making it easier to keep the document set consistent.
  • Where the seller has a volume advantage on a particular route and obtains freight more cheaply than the buyer would.
  • For deals where the importer wants to avoid the burden of separately calculating transport and insurance items when declaring customs value.

When it is the wrong choice

  • For container cargo. Containers are delivered to the terminal days before the vessel arrives. At that point the seller loses actual control over the goods, yet risk stays with the seller until loading on board. This gap is the same problem that arises under FOB, and CIP is recommended instead of CIF for container shipments.
  • When the buyer expects broad cover but the level of cover is not written into the contract. The minimum ICC (C) applies and the buyer can be left unprotected after damage; the buyer may need to take out an additional policy.
  • When the buyer expects delivery to its factory or warehouse. CIF is a port rule; for delivery to an inland point, DAP, DPU or DDP should be considered.
  • For air, road or rail transport. Writing CIF for these modes creates document and liability confusion.
  • When the buyer wants to control costs at the port of destination. Because the seller chooses the carrier, terminal, documentation and delivery-order fees at the destination can turn out higher than expected.

Common mistakes

  1. Assuming risk passes at the port of destination. Risk passes at the port of loading, on loading aboard the vessel.
  2. Assuming that “the seller took out insurance, so cover is complete.” ICC (C) is narrow cover.
  3. Writing CIF out of habit for container cargo; CIP is more suitable.
  4. Not stating the Incoterms version next to the delivery term. It should read “CIF Mersin, Incoterms 2020”, not just “CIF Mersin.”
  5. Naming a country or city instead of a port of destination; this creates ambiguity where there is more than one port.
  6. Failing to transfer the insurance policy or certificate to the buyer. The buyer can only pursue a claim once it has been transferred.
  7. Not checking who is responsible for costs at the port of destination against the carriage contract; the same item can end up paid twice or produce a surprise invoice.
  8. Reading CIF as governing transfer of ownership or the method of payment. The rule regulates neither.
  9. Not accounting for free time; delay on arrival is generally passed on to the buyer as demurrage and storage, and sometimes falls on the seller depending on the contract of carriage.

The choice of delivery term, the freight contract, the level of insurance cover and the declaration of customs value are interlinked items. Planning sea carriage, cargo insurance and customs formalities together at the same time heads off the most common surprises under CIF.

This page is general information, not legal advice. Regulations change; confirm the current position before acting.

FAQ

  • What is the difference between CIF and CFR?

    The only difference is insurance. Under CFR (Cost and Freight) the seller pays freight to the port of destination but has no obligation to take out insurance; under CIF that obligation exists. The point at which risk transfers and the split of export and import customs formalities are the same under both rules.

  • Are CIF and CIP the same thing?

    No. CIF is used only for sea and inland waterway transport, whereas CIP applies to all modes of transport, including multimodal. In addition, under Incoterms 2020 the minimum insurance cover for CIP is ICC (A), while for CIF it is ICC (C).

  • Does CIF insurance cover every type of cargo damage?

    No. The minimum cover, ICC (C), covers only a limited list of risks; common types of damage such as theft, non-delivery, wetting and breakage fall outside this cover. ICC (B) is not sufficient for theft, non-delivery or breakage either; these risks are covered only under ICC (A) (all risks) or by specific additional clauses. ICC (B) adds to ICC (C) risks such as earthquake/lightning, washing overboard and entry of sea, lake or river water into the vessel or container. If the buyer wants broader protection, ICC (A) should be agreed in the sales contract, or an additional policy should be taken out.

  • How does a CIF price feed into customs value on import?

    Under Article 27 of Customs Law No. 4458, for imports into Türkiye customs value includes the cost of transport and insurance up to the port or place of entry into Türkiye, together with the loading and handling costs related to that carriage. A CIF invoice generally already covers transport and insurance, so the declaration often needs less additional calculation; however, if the destination port named in the contract differs from the port or place of entry into Türkiye, the costs must be broken out separately.

Ready to move smarter?

No call centres, no runaround. Just experienced people ready to help.

Work with us